FIDIC Conditions of Contract for Underground Works (2019 Emerald book), reprinted in 2023 with amendments
FIDIC Conditions of Contract for Underground Works designed by the Contractor according to the reference design by the Employer and the Geotechnical Baseline Report. These Conditions include extensive guidance for the preparation of Tender documents and example forms for the Schedule of Baselines, the Completion Schedule and the Schedule of Contractor’s Key Equipment. Reprinted in 2023 with amendments.
FIDIC Underground Works Contract (Emerald Book) Guide (First Edition 2023)
FIDIC Underground Works Contract (Emerald Book) Guide for Conditions of Contract for Underground Works First Edition 2019 (First Edition 2023)
FIDIC Contracts Guide (2nd Edition 2022)
FIDIC Contracts Guide to the Construction, Plant and Design-Build and EPC/Turnkey Contracts (2nd Edition 2022).
EPC/Turnkey Contract 2nd Ed (2017 Silver Book, Reprinted 2022 with amendments)
EPC/Turnkey Contract 2nd Ed (2017 Silver Book Book Reprinted 2022 with amendments)
Plant and Design-Build Contract 2nd Ed (2017 Yellow Book, Reprinted 2022 with amendments)
Plant and Design-Build Contract 2nd Ed (2017 Yellow Book Reprinted 2022 with amendments)
Construction Contract 2nd Ed (2017 Red Book, Reprinted 2022 with amendments)
Construction Contract 2nd Ed (2017 Red Book, Reprinted 2022 with amendments)